Contact us: +44 (0)1732 868200

Contact Us





Our Projects

Our most recent BMS and integration projects.

  • All Projects
  • Commercial
  • Education
  • Hotels
  • Other

H M P Belmarsh

H M P Belmarsh

Full BMS and head-end installation £850k

The Adelphi, London

The Adelphi, London

Full Trend 945 head-end attached to 600 Trend Lon works terminal units. £250k

Churchill Insurance HQ, Bromley

Churchill Insurance HQ, Bromley

Three-year three phase development; 800 FCU, six main plant rooms, plus head-end. £400k

16 Eastcheap, London

16 Eastcheap, London

Full Trend 945 head-end attached to VAV main plant. £120k

Guildway Development, Guildford

Guildway Development, Guildford

Two buildings, each with 120 fan coil units and two plant rooms connected to remote head-end. Siemens. £120k

Black’s Road, Hammersmith

Black’s Road, Hammersmith

Full DDC main plant and 130 DDC FCU. Siemens. £80K

Shaftsbury House, London

Shaftsbury House, London

Full DDC main plant (300 points) and 300 FCU; Siemens. £160k

Copthorne Hotel, Gatwick

Copthorne Hotel, Gatwick

Trend main plant and 150 DDC terminal units with Trend-clone Doorway and book-in system interface. £110k

Penny Hill Park Spa

Penny Hill Park Spa

Full Trend system controlling multiple items of main plant together with FCU and VAV terminal units. £300k

Imperial College

Imperial College

Trend 945 on CHP and steam plant 300 points. £80k

About Us

The company was founded in 1995 and we have had many years of progressive but controlled growth with a current annual turnover of around £1m from both UK and overseas operations.

All our control panels are built in-house with many of our clients considering these to be some of the best built within the industry. We employ classical engineering techniques combined with a logical layout and attention to detail on door fascia.

We have extensive experience not only in the commercial sector, but also with the latest energy concepts. These include working on projects employing displacement ventilation and 'Termodeck' plant (using the building's floor slabs as a method of heating and cooling), maximised use of variable speed drives, sea-water cooling techniques and naturally ventilated buildings. This is now more important than ever with the introduction of the climate change levy and continual changes to part L of the building regulations.

Our project range covers from £5k to £800k+ from the full spectrum of market sectors within the industry.

We are a registered Trend and Siemens Systems Integrator.

Our Team

The team delivering your solution: